
Add to Cart
Innovative Re-Fuse Braced Frame Steel Structure Warehouses For Enhanced Resilience
Description
Steel structure warehouses are transforming the industrial storage industry with their superior strength, adaptability, and operational efficiency. Constructed from robust steel, these facilities are versatile, catering to a wide range of storage needs and can be tailored to meet the precise specifications of our clients. They are recognized for their rapid construction and low maintenance demands, offering substantial economic benefits over time. Suited for businesses in need of durable, scalable, and cost-effective storage, steel warehouses offer enduring stability and the flexibility to adapt to the changing tides of commerce. This makes steel structure warehouses a cutting-edge and smart choice for industrial infrastructure, adeptly responding to the dynamic challenges of the contemporary business world.
Specification
Items |
Specification |
|
Mai n Steel Frame |
Column/ Beam |
q235, q345 welded / hot rolled h section steel |
Secondary Frame |
Purlin/ Bracing |
q235 c or z purlin / angle steel / round bar |
Main tenance Sys tem |
Roof / Wall panel |
ppgi single corrugated sheet / eps,rock wool,pir,fiberglass wool panel |
Insulation |
fiber glass wool / pe foam |
|
Accessories |
Window |
aluminum alloy window / pvc window etc. |
Door |
sliding sandwich panel door / rolling metal door / person entrance door |
|
Downspout System |
304 stainless gutter+ pvc pipe |
|
Wind Speed |
100km/h to 300km/h |
|
Structure Usage |
up to 50 years |
|
Finish i ng Opti ons |
alkyd paint/ epoxy paint/ hot dip galvanized |
Production Process
Why Steel Structure Warehouse ?
1. Rapid Steel Structure Deployment: We prefabricate our steel structures away from the construction site, drastically cutting down on-site assembly time and hastening project completion. This streamlined construction method is a significant advantage of our steel construction strategy.
2. Resilient and Eco-friendly Steel Architecture: Our steel structures are designed for longevity and are equipped with advanced anti-corrosion technology. Made from robust, corrosion-resistant cold-rolled galvanized steel, they retain their strength and stability, positioning them as a sustainable and durable construction option.
3. Adaptable Steel Construction Solutions: Our pre-engineered steel structures are highly flexible, enabling them to be integrated into diverse architectural and environmental settings without difficulty. This adaptability fosters the development of innovative construction methods.
4. Earthquake-Ready Steel Buildings: Utilizing the natural strength and flexibility of steel, our pre-engineered buildings offer enhanced seismic resistance, significantly reducing the risks associated with earthquakes.
5. Ecologically Responsible and Energy-Efficient Construction: Our steel structures lead in sustainable construction practices, focusing on waste minimization and resource conservation. This approach not only lessens the environmental footprint of construction but also promotes energy efficiency, in line with sustainable development goals.
Packing & Loading:
At our advanced logistics center, we carefully prepare a comprehensive selection of steel components—including panels, beams, fasteners, and hardware—for secure maritime transportation in 40-foot High Cube (HQ) containers. Our skilled workforce, renowned for their precision and meticulous attention to detail, expertly maneuvers heavy machinery such as cranes and forklifts to handle the cargo, strictly following safety protocols to guarantee the secure and damage-free arrival of goods at their destinations.
FAQ:
1.You are manufacture factory or trading company?
We are direct manufacture factory, located in Qingdao, China, very close to Qingdao port. we have strictly quality management system,professional design team, strong production capacity and rich manufacturing experience.
2.How about your quality control?
1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct
100% strict testing on the raw materials before entering our factory.
2)our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
4)Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
3.What's the delivery time?
Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.
4.Do you offer service for installation?
Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
5.What's the payment term?
We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
2)100% irrevoable L/C
6.How to get a fast quotation?
Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.
7.Is your price competitive compared with other companies?
We are direct factory, yes, it`s competitive, price and quality are guaranteed.
Our Steel Structure Fabricaiton Factory:
We manage three cutting-edge H-beam production lines, catering to both lightweight and heavyweight steel structures, along with a BOX line, C/Z purlin lines, and an array of steel sheet profiling machinery. Our machinery includes an advanced plasma cutting machine, showcasing our commitment to state-of-the-art production technology.
Certification
Product Attributes